Behind the walls.
Before the crowd.
48-hour shutdown. Zero game-days missed.
Pressure Test
Projects Completed
Across 23 states
Avg. Downtime
Season-safe scheduling
Three facilities.
Three emergencies.
Zero misses.
Each project escalates in complexity — building proof that compounds with every scroll.


Hot Water Capacity
Facility Downtime
Annual Water Savings
Riverside Aquatics Center
Domestic hot-water system replacement, 3 pool-loop headers
Sixty-year-old galvanized supply mains serving a 6-lane competition pool. Swimmers reporting cold showers 3 hours into morning practice. Corrosion pinholes causing 800 gallons/day loss.
Replaced 340 linear feet of galvanized with Type-L copper. Installed dedicated recirculation loop and tankless commercial water heaters staged for load balancing.
System Diagram
Surgical scheduling.
The season never noticed.
Hartwell Events Center — 11-week retrofit mapped against a live Division I basketball schedule. Every phase engineered around event windows.
Wk 1–3
Concourse Mains
Trench-free pipe bursting beneath concourse slab. Night shifts only.
Wk 4–7
Locker Suite Copper
Open-chase Type-L copper in both locker wings. LED-lit manifold install.
Wk 8–10
Fire Suppression
Tie-in to existing sprinkler grid, pressure test, city inspection sign-off.
Wk 11
Final Buffer
Punch list, flow-rate verification, facilities director walkthrough.
The numbers don't
lie under pressure.
Hartwell Events Center — Pre/Post Retrofit Measurements
Mainline came in while we had a conference tournament in 11 weeks. They mapped every phase around our calendar. When the tip-off happened, fifty-two hundred people walked through those concourse doors and not one of them knew we'd just replaced every inch of pipe beneath their feet.

Marcus Whitfield
Director of Facilities Operations
Hartwell University Athletics
Grade your facility's
plumbing health.
Five questions. Two minutes. A real risk score built from the same diagnostic criteria our engineers use on-site.
5-Step Facility Diagnostic
~2 minutes to complete
Answer five questions about your facility's plumbing history and current conditions. We'll generate a real risk score and plumbing grade — the same framework our engineers use before scoping a project.
Live Risk Gauge
Start the diagnostic to see your grade
Full Report Includes
- Pipe-age mapping by zone
- Failure probability by system
- Recommended phasing plan
- Off-season scheduling model
- Code compliance checklist